South East Queensland Power & Wastewater Rules, by Council
Every council on this page sits within Energex's territory, so there's no distributor-level variation to report between them (see the state-wide QLD article for export limits and the wastewater threshold). The SWER-line rural export limit covered in our state article doesn't apply anywhere in SEQ, since Energex's network doesn't use SWER infrastructure the way Ergon's does further out. Looking for a regional council instead? See the Regional Queensland power & wastewater rules by council page.
Frequently Asked Questions
Does the export limit vary between SEQ councils?
No. All nine SEQ councils (Brisbane, Gold Coast, Sunshine Coast, Moreton Bay, Ipswich, Logan, Redland, Scenic Rim, Lockyer Valley) sit within Energex's network, with the same standard 5kW-per-phase export limit applying throughout.
Does the SWER-line rural export limit apply in any SEQ council?
No. SWER (Single Wire Earth Return) rural infrastructure is used on Ergon's regional network, not Energex's SEQ network, so the stricter 2kW export limit doesn't apply anywhere in South East Queensland.
Where do I check my exact connection requirements in SEQ?
Energex's own website and application portal (via energyqueensland.com.au) is the definitive source for your specific address.