Every council on this page sits within Energex's territory, so there's no distributor-level variation to report between them (see the state-wide QLD article for export limits and the wastewater threshold). The SWER-line rural export limit covered in our state article doesn't apply anywhere in SEQ, since Energex's network doesn't use SWER infrastructure the way Ergon's does further out. Looking for a regional council instead? See the Regional Queensland power & wastewater rules by council page.

Before you act on any of this: this page is a research aid, not a legal reference. Always confirm your exact connection requirements directly with Energex before assuming any figure applies.
All of SEQ is Energex territory: Brisbane, Gold Coast, Sunshine Coast, Moreton Bay, Ipswich, Logan, Redland, Scenic Rim and Lockyer Valley all sit within Energex's network, which runs from the NSW border north to Gympie and west to the foothills of the Great Dividing Range. Unlike regional Queensland, none of these councils have any SWER-connected rural properties facing the stricter 2kW export limit — Energex's standard 5kW-per-phase limit applies consistently across all nine.
Wastewater is also uniform across SEQ: the Plumbing and Drainage Act 2018's 20-equivalent-person threshold, and the council/state approval split above it, applies identically regardless of which SEQ council you're in. The Department of Housing, Local Government, Planning and Public Works handles anything above that threshold across the whole state, not on a council-by-council basis.

Frequently Asked Questions

Does the export limit vary between SEQ councils?

No. All nine SEQ councils (Brisbane, Gold Coast, Sunshine Coast, Moreton Bay, Ipswich, Logan, Redland, Scenic Rim, Lockyer Valley) sit within Energex's network, with the same standard 5kW-per-phase export limit applying throughout.

Does the SWER-line rural export limit apply in any SEQ council?

No. SWER (Single Wire Earth Return) rural infrastructure is used on Ergon's regional network, not Energex's SEQ network, so the stricter 2kW export limit doesn't apply anywhere in South East Queensland.

Where do I check my exact connection requirements in SEQ?

Energex's own website and application portal (via energyqueensland.com.au) is the definitive source for your specific address.